Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.
| Patient Application |
|
|---|---|
| Application Site |
|
| Lead Set Length |
|
| Number of Leads |
|
| Shielded |
|
| Electrode Attachment Method |
|
| Color Coding |
|
| Use with Non-Philips Healthcare Equipment |
|
|---|---|
| Product Category |
|
| Use with Philips Healthcare Equipment |
|
| Product Type |
|
| CE Certified |
|
| Single-Patient Use OR Multi-Patient Use |
|
| Packaging Unit |
|
| Not manufactured with natural rubber latex |
|
| Sterile OR Non-Sterile |
|
| Minimum Shelf Life |
|
| Use with Other Supplies |
|
| Patient Application |
|
|---|---|
| Application Site |
|
| Use with Non-Philips Healthcare Equipment |
|
|---|---|
| Product Category |
|
| Patient Application |
|
|---|---|
| Application Site |
|
| Lead Set Length |
|
| Number of Leads |
|
| Shielded |
|
| Electrode Attachment Method |
|
| Color Coding |
|
| Use with Non-Philips Healthcare Equipment |
|
|---|---|
| Product Category |
|
| Use with Philips Healthcare Equipment |
|
| Product Type |
|
| CE Certified |
|
| Single-Patient Use OR Multi-Patient Use |
|
| Packaging Unit |
|
| Not manufactured with natural rubber latex |
|
| Sterile OR Non-Sterile |
|
| Minimum Shelf Life |
|
| Use with Other Supplies |
|
You are about to visit a Philips global content page
ContinueWebová stránka je určená len pre osoby, ktoré používajú zdravodntícke pomôcky ako profesionáli, vrátane zdravotníckych pracovníkov, osôb konajúcich za poskytovateľov zdravotnej starostlivosti alebo za obchodníkov so zdravotníckymi pomôckami.
Ste osoba, ktorá spĺňa vyššie uvedené kritériá?